The raft was completed yesterday evening. The second story was braced and disassembled for transportation. Some of the barrels around the wheel well of the trailer had to be loosened so that the raft could be stowed level. A truck was needed for towing which was provided by Matt of Fence4U. In Part 5 I will have photographs of the launch at Causey Reservoir. Click on the images to enlarge.
Paul says
The base section of the raft pictured here weighs 630 pounds. We got really tired carrying it to the water.